We need to bring uncertainty back to risk measurements.

Suppose I ask you to measure the wingspan of a Boeing 747. Right now, wherever you may be, with the knowledge and tools you have on hand. You may say this isn’t possible, but Doug Hubbard has taught us that anything can be measured, once you understand what measurement is. With that mental hurdle out of the way, you can now measure the wingspan of a Boeing 747.

There are two different approaches to this in modern business.

Option 1:Think about the size of a passenger jet and say, “Big.”

A Boeing 747 in flight above a green, yellow and red scale reading small, medium and big, with a speech bubble that says "Yeah, big."

Technically, this answers my question. There’s a problem with this answer, however - it’s neither precise nor accurate. In everyday language, the words precise and accurate are used interchangeably. In areas of science where measurements are frequently used, they mean different things. Accurate means the measure is correct while precise means the measure is consistent with other measurements.

The word “big” is an adjective to describe an attribute of something, but without context or a frame of reference to make a comparison, it’s virtually meaningless. Furthermore, using an adjective in place of a measurement is a little dishonest. It’s true that we don’t know the exactwingspan of a 747. Besides, wingspans vary by model. However, we chose a word, “big,” that conveys precision, accuracy, and exactness, but is not any of those. If that wasn’t bad enough, we’ve completely obfuscated our level of uncertainty about our ability to estimate the wingspan of a 747.

Option 2:What Would Fermi Do?

The same 747 beside a range from 126 to 300 feet with a midpoint of 212.8, and a speech bubble that says "I'm 90% confident that the correct number is between 300' and 126'."

Thinkers like Enrico Fermi and Doug Hubbard approach the problem differently. They – just like us – probably don’t know the wingspan of a 747 off the top of their heads. Just like Fermi estimated the number of piano tuners in Chicago simply by thinking through and decomposing the problem, we can do the same.

  • I’ve seen a 747 and even flown on one several times, so I have some frame of reference.
  • I'm 6'2," and I know a 747 is larger than me
  • A football playing field is 100 yards (300 feet), and I'm sure a 747's wingspan is smaller than a football field
  • My first estimate is between 6’2” and 300 feet – let’s improve this
  • I know what a Chevy Suburban looks like – they are 18 feet long. How many Suburbans, front to back, would equal a 747? Maybe…. 7 is a safe number. That’s 126 feet.
  • I’m going to say that the wingspan of a 747 is between 126’ and 300’.
  • Am I 90% sure that the actual number falls into this range (aka confidence interval)? Let me think through my estimations again. Yes, I am sure.

Let’s check our estimation against Google.

Google answer box: Boeing 747 wingspan, 196 feet 0 inches

It’s a good measurement.

Two remarkable things happened here. Using the same of data as “big” – but a different mental model - we made a measurement that is accurate. Second, we expressed our uncertaintyabout the measurement - mainly, we introduced error bars.

One missing data point is whether or not the level of precisionis adequate. To answer this, we need to know why I asked for the measurement. Is it to win a pub trivia game or to build an airplane hangar to store a 747? Our minds are instruments of measurement. We may not be as accurate as a tape measure, which is not as accurate as a laser distance measurer, which is not as accurate as an interferometer. All instruments of measurement of have error bars. When determining the level of precision needed in a measurement, we always need to consider the cost of obtaining new information, if it’s relevant and if we need additional uncertainty reduction to make a decision.

If this seems like a nice story to you, but one that’s not too relevant - think again.

Using adjectives like “red” or “high” in the place of real measurements of risk components (e.g., probability, impact, control strength) are neither precise noraccurate. Even worse, uncertainty is obscured behind the curtain of an adjective feelsexact, but is not. The reader has no idea if this was a precise measurement – using a mixture of historical data, internal data and many calibrated subject matter experts – or if it was made by a guy named Bob sitting in an office, pondering the question for a few seconds and then saying, “That feels High.”

Managing risk is one of the most important things a business can do to stay in business. It’s time to bring uncertainty back to risk measurements. It’s the honest thing to do.

More on Judgment & Decisions

Leave a Reply

Heatmaps to Histograms: Field Notes

It’s a free newsletter for risk and security professionals, and each issue brings a practical CRQ technique, a case study from the field, and a tool or prompt you can use the same day.

Your welcome email includes Chapter 5 of the book, Your First Quantitative Risk Assessment, where you build a Monte Carlo simulation in Excel and run a complete risk analysis, free.